MGT 259: Operations Planning and Control

2008-09 2009-10 →
changes (lax) changes (strict) ▾ 2012-13 → 2012-13 →

Units: 4

Hours: Seminar, 3 hours; outside projects and extra reading, 3 hours

Catalog page 308

Prerequisites: MGT 207

Description: A study of the design of systems used for controlling assets, plan- ning, and scheduling in manufacturing and service operations. Includes analysis of operating systems and discussion of planning and scheduling methods, heuristics, and interfaces with MRP and JIT inventory systems. Emphasizes the importance of integration, flexibility, and automation of the operation system.

Derived Information — The following is not part of the official catalog but is computed from catalog data.
Prerequisite graph not available.
Enrollment History (from UCR Banner, not catalog)
Year F W S Su Total
2025-26 11/70 11/70