February 06, 2002
UCR CS269: Hardware/Software Engineering of Embedded Systems
24
Inter-Instruction Effects:     Resource Constraints
•To account for the energy cost of the stalls during program cost estimation, the number of stall cycles has to be multiplies by the experimentally determined stall energy cost. This product is then added to the base cost of the program. The number of stall cycles is estimated through a traversal of the program code.