February 06, 2002
UCR CS269: Hardware/Software Engineering of Embedded Systems
23
Inter-Instruction Effects:     Resource Constraints
•It has been observed that the cost of stalls can show some variation depending upon the instructions involved in the stall. •However, in general the use of a single average cost value for each stall type is sufficient.
•