February 06, 2002
UCR CS269: Hardware/Software Engineering of Embedded Systems
22
Inter-Instruction Effects:     Resource Constraints
•The energy cost of each kind of stall is determined through experiments that isolate the particular kind of stall. •For example, an average cost of 250 mA for stall cycles was determined for the prefetch buffer stall.