February 06,
2002
UCR CS269:
Hardware/Software Engineering of Embedded Systems
Inter-Instruction Effects: Resource Constraints
•The energy cost of each kind of stall
is determined
through experiments that isolate the particular kind of stall.
•For
example, an average cost of 250 mA for stall cycles was determined for the
prefetch buffer stall.