February 06,
2002
UCR CS269:
Hardware/Software Engineering of Embedded Systems
Base Cost Examples
•Here is an example of CPU base costs for some of the instructions. The numbers in Column 3 are the observed average current values. The overall base energy cost of an instruction is the product of Column 3,4, and the constants Vcc and T.