February 06, 2002
UCR CS269: Hardware/Software Engineering of Embedded Systems
14
Base Energy Cost
•The base cost for an instruction is determined by constructing a loop with several instances of the same instruction. The average current being drawn is then measured. This current is then multiplied by the number of cycles taken by each instance of the instruction.